Laserfiche WebLink
North Poudre Irrigation Company Agenda Item 28a <br /> March 22-23, 2017 Board Meeting(Updated March 23, 2017) <br /> Page 3 of 6 <br /> TABLE 1: IMPACTED WATER RIGHTS <br /> Name Amount Appropriation Adjudication Water Court <br /> Date Date Case No. <br /> 344 <br /> MOUNTAIN SUPPLY RES 10 acre-feet 5/15/1905 4/22/1922 CA2031 <br /> (storage) <br /> Average annual diversions of the entire Company are 88,900 acre-feet. <br /> Project Description <br /> The purpose of the Project is to repair the Mountain Supply Reservoir No. 10 inlet and outlet works, <br /> removing the SEO storage restriction and repairing the reservoir in order to store its full storage rights. <br /> Primary project elements include repair of the intake structure at the Upper 10 ditch, repair or <br /> replacement of the pipeline leading from the ditch to the reservoir, grading across the reservoir, <br /> construction of a new spillway control wall, and repair or replacement of the dam outlet works. <br /> The Feasibility study evaluated alternatives for this project: <br /> Alternate 1 - No Action: This alternate was considered unacceptable, as the Company could not store its <br /> decreed rights, nor provide service to 48 shareholders who collectively own 81 shares of stock that <br /> receive water from Mountain Supply Reservoir No. 10 through the Lower 10 ditch. Approximately 600 <br /> acre-feet of water is delivered annually to these shareholders. <br /> Selected Alternate 2 - Repair inlet and outlet infrastructure: This alternate meets the goals of the <br /> project with the following methods: <br /> • Inlet works: Repair 500 feet of 30-inch inlet works conduit by installing cured-in-place pipe <br /> (CIPP) lining from Upper 10 ditch to the reservoir, replacement of the inlet structure, and <br /> construction of a new dissipation structure at the end of the inlet pipeline. <br /> • Reservoir Site: Within reservoir, remove silt and straighten the bottom channel from the <br /> dissipation structure to the outlet works. Construct a new spillway control wall to raise the <br /> reservoir storage level six inches, allowing the Company to fully achieve storage of the decreed <br /> 344 acre-feet of storage rights. <br /> • Outlet works: Repair outlet works, including construction of a new inlet gate tower and <br /> walkway, and conduit repair by removing the temporary patch and lining the length of the outlet <br /> conduit using a CIPP liner. <br /> The Company considered alternatives to project elements in the cost analysis: <br /> • An alternative to CIPP lining of the inlet works conduit was considered in the form of removal <br /> and replacement of the existing pipe with concrete-lined steel pipe using open-cut methods. <br /> Although this option was only slightly more expensive than CIPP lining, this option was not <br /> utilized due to probable complications from easement acquisitions and a longer construction <br /> period. <br /> • An alternative to the selected gate tower and walkway would be a gate tower within the dam <br /> embankment and a secondary gate at an inlet structure, with a grade beam supporting the gate <br /> stem and vent extending from the structure to the dam crest. This would only be a viable <br /> alternative if the dam were to be breached. The gate tower with walkway was selected because <br /> the design was successfully used on the Company's nearby and very similar Reservoir No. 9, thus <br /> reducing engineering and design costs. <br /> • An alternative to the CIPP lining of the existing intake structure's existing CMP pipe would be an <br /> open-cut breach of the dam to replace the outlet conduit with a new pipe. This would involve <br /> the removal and replacement of approximately 4,000 cubic yards of dam embankment material, <br />