Laserfiche WebLink
Step 6 <br /> • Use Identity to copy Structure ID data from the 1993 map to the 1999 map. <br /> o Using the Identity command, and "intersecting polygons", copy the Structure ID from the <br /> old to the new. <br /> o Perform QA/QC on these using plots and field personnel. <br /> D. Labor and Time estimates for completion for entire West Slope <br /> • Results of Pilot Project <br /> �Or <br /> SOW 42 <br /> Setup 9 <br /> Registration of images and data 15 • <br /> gathering <br /> Classification of Images 174 <br /> Polygon Interpretation 102 <br /> Plots and Presentations 52 <br /> Water Commissioner Time 8 <br /> IT/DE/ADE time 47 <br /> Total Time 449 <br /> • <br /> 5 <br />