Laserfiche WebLink
• Coordination and oversight of annual whooping crane monitoring data compilation and analysis. <br /> • Collaboration with WC Telemetry Project, data use and review protocol issues and discussions <br /> requiring significant time commitment. Issues will be brought to GC attention for direction as <br /> resolution has not been achieved. <br /> • Coordination with RWBJV for data development and analysis of habitat suitability parameters on- <br /> going. <br /> • Compilation of T&P and Whooping Crane data on-going to achieve uniform data sets, Web <br /> database issues causing considerable redo effort.Working with RTI for resolution. <br /> • Analysis of T&P breeding pair and Whooping Crane site selection data in intensive phase. <br /> Significant staff time being dedicated to this activity. Publication prepared and ready for TAC <br /> review. <br /> • Oversight of website and database management system development and maintenance activities <br /> requiring significant effort as database and fundamental website activities sporadically stop <br /> functioning. RTI working to fix issues, but progress slow. <br /> • Efforts for moving forward with a Effects Analysis in the context of a Structured Decision Making <br /> Process in lieu of Target Flow analysis on-going. Developing a timeline, personnel, and budget <br /> framework for the process. <br /> • Forage fish analysis and draft article in review and revision process. <br /> • Design of wetlands at DeBore Tract nearing completion with development of Plans and <br /> Specifications. <br /> • Bid package for Liehs Tract palustrine wetland completed and pending FC approval for <br /> advertisement. <br /> • Oversight of Alda Pit excavation activities underway. <br /> • Construction of three check structures on Morse Tract completed. <br /> • Preparing bid package for John's Tract control structures. <br /> • Selection of USGS as T&P Monitoring Contractor with scope and budget negotiations underway. <br /> • Preparations for spring crane migration monitoring initiated, contractor coordination and land <br /> owner contacts for decoy placement the focus of efforts. <br /> Outreach and Operations <br /> • Routine daily operations associated with management and support of EDO staff, acquisition of <br /> supplies and equipment, oversight of consultant and contractor contracts and payment, <br /> maintenance of property files, coordination of meeting logistics, and general administration of <br /> Program. <br /> • Compilation and assemblage of 2013-2014 Biennial Report underway. <br /> • Attendance and exhibitor at Colorado Water Congress January 28-30 in Denver, CO. <br /> • Participation in FC conference call on February 25. <br /> . _ r T e3/Id/15" <br /> Jerry F. Kenny, Ph.D. Date <br /> 3 <br />