Laserfiche WebLink
Next Steps toward Project Completion <br /> Paradox Valley Pilot Evaporation Pond <br /> I. COORDINATE PROPOSAL AND PLANS WITH COOPERATING AGENCIES(ONGOING) <br /> II. ENVIRONMENTAL ASSESSMENT <br /> Scoping to Identify Significant Issues to be Addressed in EA <br /> Consultation and Coordination with Agencies <br /> Prepare Draft EA and Solicit Comments <br /> Public Meeting on Draft EA <br /> Perform Surveys(e.g.,plants,endangered animals) <br /> Address Comments and Finalize EA <br /> III. DESIGN <br /> Air Stripping/Brine Treatment <br /> Obtain brine chemical composition data including volatile organic compounds(VOCs) <br /> Obtain allowable discharge volumes of VOCs from EA report,EPA,and/or State agency <br /> Design air stripping or other brine filtering system as needed <br /> Pumping <br /> Analyze options for getting brine from extraction wells into pond pipeline <br /> Design valve(s)and pump(s)needed at extraction wells/surface treatment facility <br /> Pond <br /> Survey existing pond and site features <br /> AutoCAD Civil 3D rendering of survey points to determine precise location and shape of pond <br /> including earthwork requirements,incoming pipe location,and location of pond divider berms <br /> Prepare drawing for pond using info from survey,including overall height of banks <br /> Determine type of liner and design requirements <br /> Incorporate weather monitoring instrumentation to measure rainfall,wind,temperatures,etc. <br /> Include sound deterrent system,if required <br /> Include netting,if required <br /> Pipeline <br /> Assess existing pipeline <br /> Can it be used as-is? <br /> Can liner pipe be installed inside existing pipeline? <br /> Design pipeline crossing above/beneath river <br /> Obtain stream alteration permit for pipeline crossing as required <br /> Incorporate flow monitoring system to measure brine volumes placed in pond <br /> IV. CONTRACTS <br /> V. CONSTRUCTION PERMITS <br /> VI. CONSTRUCTION <br />