My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stakeholders Group Workplan Outline
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Stakeholders Group Workplan Outline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 3:42:41 PM
Creation date
10/12/2016 3:42:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Documents related to the Upper Colorado River Wild and Sceni Stakeholders Process
Basin
Colorado Mainstem
Water Division
5
Date
6/9/2008
Title
Stakeholders Group Workplan Outline
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s� � � F(7 7 <br /> Wade fis ' g Develop water (6,0 <br /> interviews quality monitoring <br /> and management <br /> plan <br /> 2—July Agreement on existing hydrology, update on GCSMP review and develop evaluation <br /> framework: develop criteria for selecting flow-based protective measures(may address <br /> such factors as permanency,degree of ORV protection, legality,flexibility for water <br /> operations,general acceptability,ease of implementation, enforceability,etc.) <br /> BLM internal meeting on Conceptual Plan; BLM response; hand off plan to NEPA <br /> coordinators <br /> Agree on flow Agree on <br /> targets to recommendation <br /> recommend to SG for wq monitoring I A <br /> and plan <br /> Input to matrices Input to Input to <br /> matrices matrices <br /> 3— Agreement on Flow Targets based on identified flow needs and existing hydrology, <br /> August recommended approach to addressing future hydrology,workplan to assess ability to <br /> protect flow-linked ORVs(wildlife,botanical) ' <br /> Address future Land Use S <br /> hydrology Meeting with <br /> BLM to clarify Q <br /> YL„Q r <br /> scope <br /> Assess land <br /> use protection S,�� <br /> Develop scope <br /> for addressing .2. <br /> land-based <br /> ORVs <br /> 4— Agreement on flow needs based on future hydrology; recommendation on flow-linked ORVs <br /> August and approach to land-based ORVs; initial evaluation of flow-based protection measures <br /> IS <br /> September—October <br /> Evaluation <br /> Subgroup(s)conduct evaluation of identified protective measures to present to SG, including those <br /> related to other ORVs <br /> 5—September Continue evaluation of flow-based measures;agree on preliminary* protective <br /> measures to include in the plan and rationale <br /> *Preliminary recognizing additional data collection needed in 2009 <br /> November—February <br /> Management Pieces <br />
The URL can be used to link to this page
Your browser does not support the video tag.