My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wild and Scenic Management Plan Alternative Proposed
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Wild and Scenic Management Plan Alternative Proposed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 3:42:36 PM
Creation date
10/12/2016 3:42:34 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Documents related to the Upper Colorado River Wild and Sceni Stakeholders Process
Basin
Colorado Mainstem
Water Division
5
Date
2/28/2011
Author
CWCB
Title
Wild and Scenic Management Plan Alternative Proposed
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• This MOU would be executed after BLM/USFS approve the SG Plan, and <br /> would govern the first three-to-five year provisional period of the Plan. <br /> 3. Long-Term MOU or Legal Entity for SG Plan administration. <br /> • The SG Plan provides that"[d]uring the provisional period,the <br /> stakeholders will develop either(a)a comprehensive Memorandum of <br /> Understanding among the participating stakeholders(or other form of <br /> agreement); (b) a formal legal entity(e.g., corporation,joint venture, <br /> partnership, etc.); or(c)both,that will govern the overall administration of <br /> the Plan." [SG Plan, Section VI.,page 33;AttaceritB, Section 3.A(2)]. <br /> The SG Plan also recognizes that this"long4erinOU or legal entity <br /> would be entered into subsequent to sunsetof the Pon Pill." <br /> [Attachment B, Section 2.J and 3.A(2)1. <br /> • Consistent with the above,the Dieing Committee recomniiii4sthat the <br /> content of a long-term MOU or leg 'entity,. deferred for consideration <br /> until the SG Plan is approved and we com hence operations under the <br /> provisional period of the Plan. <br /> Attachment: ft MOU for Provisional Period <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.