My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLM Extention Letter
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
BLM Extention Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2017 4:28:28 PM
Creation date
10/12/2016 3:42:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Documents related to the Upper Colorado River Wild and Sceni Stakeholders Process
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/21/2009
Author
BLM
Title
BLM Extention Letter
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. Tier 4 Elevation to BLM <br /> The following matters may be elevated to BLM for resolution: (1) Failure to <br /> meet a designated Milestone in Part I of Attachment B related to <br /> implementation of the Tier 1 long-term protection measures; (2) Failure to <br /> address a material Change in Circumstances through Cooperative <br /> Measures pursuant to Part IIB and IIC of Appendix B; or (3) Impairment of <br /> or a significant risk of impairment to the ORV Indicators attributable to <br /> circumstances considered by the Plan. [Fn: The ;,itakehc,idr <br /> standards to identify'inh c "s ijnitic+'.tr<i risk of <br /> ;`. , ,• ,i ;.,1,` io ORV Ind`r:atdrs poor to s'(l('pip::0"ion of the Draft EIS, <br /> : ,aouiariisfoC idermfyin?q a s�t.cinirTart€ t't�:k r)t imphirt em <br /> nt ay <br /> toe Stakeitcidei G oup witht I('tC+ `j-d yec,tr study period <br /> •:,it•i"shOhi-hent of the Plan in accordan(F ' t,th the t,:overnance <br /> Elevation to BLM for any of the reasons identified in this Section IV.e shall <br /> be initiated by a formal notification to BLM which details the issue, relevant <br /> data, and any steps undertaken to date in efforts to address the concern. <br /> Upon elevation to BLM, the Stakeholder Group shall work with BLM in <br /> efforts to resolve the identified concern to the satisfaction of BLM prior to <br /> BLM exercising its discretionary authorities. <br /> f. New Projects (including changes to existing projects undergoing federal <br /> permitting or requesting federal funding or other federal assistance) <br /> Proponents of new projects that seek federal authorization, funding <br /> or assistance may choose to rely on (i.e., "opt-in" to) this Plan as a <br /> means for proposing protection of the ORVs. New project <br /> proponents that opt-in to this Plan will agree to follow the <br /> Cooperative Measures procedures in paragraph IV.c.i. above. In <br /> addition, opt-in proponents would agree to either (1) demonstrate to <br /> BLM and any federal action agency that the proposed project will <br /> be operated consistent with the Resource Guides; or(2) <br /> demonstrate to such agency(ies)that operation of the proposed <br /> project in a manner inconsistent with the Resource Guides will not <br /> impair the ORV Indicators; or(3) propose measures that are <br /> adopted by such agency(ies)that will effectively mitigate impacts to <br /> the ORVs due to the operation of the proposed project. <br /> (SG 'Ali! explore „s:irrot c+ rit:ept {';t SG par'tt(apootlt ..'tit;r.:rt l:: ll00)0 <br /> ;j;atltit;fa(d ihr(lti h :i r}rnit?Ot ..�}t 1,�_jr-�' c.r)osr ittHtrr" vvTh �:.d`� ie glee r.r <br /> Page 13 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.