My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLM Extention Letter
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
BLM Extention Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2017 4:28:28 PM
Creation date
10/12/2016 3:42:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Documents related to the Upper Colorado River Wild and Sceni Stakeholders Process
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/21/2009
Author
BLM
Title
BLM Extention Letter
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fishing (Segments 4 and 5): a range of <br /> opportunities for fishing the existing range and <br /> quality of opportunities for fishing. <br /> Boating (Segments 4 through 7): a range of .. <br /> opportunities for floatboating the existing range and <br /> quality of opportunities for floatboating. <br /> Impairment of or a significant risk of impairment to the Provisional <br /> or final ORV Indicators would be cause for elevation of this Plan to <br /> BLM pursuant to Section IV.e. <br /> Resource Guides <br /> Streamflow-influenced ORVs may be affected by factors such as <br /> flows, temperature and water quality. This Plan establishes ranges <br /> for these factors, referred to as "Resource Guides," which are <br /> described in Part III of the Plan. Not all stakeholders endorse these <br /> Resource Guides or believe that the ranges they represent are <br /> necessary to support the ORVs. Nevertheless, the Stakeholder <br /> Group agrees to include these guides to inform decision-making <br /> and as a trigger for implementation of the cooperative measures <br /> process described in Section IV.c of the Plan. Section IV.f <br /> addresses how Resource Guides will inform decisions with respect <br /> to new projects and changes to existing projects requiring federal <br /> approvals or requesting federal funding or other federal assistance. <br /> Failure to achieve these Resource Guides may trigger the elevation <br /> procedures within the Stakeholder Group as provided in Section <br /> IV.d of the Plan but would not independently be cause for elevation <br /> of this Plan to BLM pursuant to Section IV.e. <br /> c. Context of ORVs - Existing Conditions <br /> i. Existina Flow Conditions <br /> Figure 1 (see Attachment C) compares the average annual <br /> flow at Kremmling for the 1984 —2006 period with the <br /> periods 1904 — 1919 (pre-Moffat and C-BT systems) and <br /> 1962 — 1984 (pre-1984 Operating Rules for Green Mountain <br /> Reservoir and pre-Windy Gap). <br /> Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.