Laserfiche WebLink
Prepare to Plan <br /> ■Write a preparation plan NOTES <br /> 1) The chart shows <br /> minimum planning <br /> Issue NOIt to prepare the requirements according to <br /> atneudmentyEIS and Analyze the <br /> start sw laregulation.or BLM <br /> start scooping Management Situation policy. BLM managers <br /> can go beyond these <br /> • Document results in an requirements.as needed or <br /> analysis of the management desired. <br /> Conduct Scoping g situation(AMS) <br /> ■ Provide a minimum 30-day <br /> comment period on issues and 2) Boxes around steps <br /> planning criteria indicate required <br /> • Document results in a documents. <br /> scoping report <br /> 3) Inventory of resource <br /> I + extent and condition should <br /> occur as needed,but is <br /> Formulate Alternatives most useful prior to the <br /> analysis of the <br /> May 2010 <br /> Analyze Effects of Alternatives management situation. <br /> 4 Abbreviations: <br /> Select a Preferred Alternative <br /> 4 EIS-- Environmental <br /> Impact Statement <br /> Prepare a Draft R11P NOI--Notice of Intent <br /> Aineudutent)•Draft EIS NOA—Notice of <br /> Availability <br /> 4 R P--Resource <br /> Publish NO11& provide a Management Plan <br /> 90-I--day publiccommentperiod <br /> 4 BL1I must publish a notice to <br /> Prepare a Proposed RIP <br /> the Federal Register <br /> (�tnendtneutllFival EIS -States can negotiate a shorter <br /> teview period with the Governor. <br /> 'If changes are significant,issue a <br /> uctice of significant change and <br /> provide a 30-dav comment period. <br /> Publish NOA1,provide a 30-day Provide a 60 dad' Governor's <br /> s <br /> Consistency Review period- <br /> protest period, and resolve <br /> protests <br /> = <br /> Prepare Record of Decision'Approved RiIP <br /> (Amendment) <br /> Implement,Monitor, and <br /> Evaluate Plau Decisions <br /> Page- 4 - of 12 <br />