Laserfiche WebLink
Grand Valley Water Users Association Agenda Item 17a <br /> September 21-22, 2016 Board Meeting(Updated September 22, 2016) <br /> Page 6 of 8 <br /> Final Deliverable: At completion of the Project, the applicant shall provide the CWCB a final report <br /> that summarizes the Project and documents how the Project was completed. This report shall contain <br /> photographs, summaries of meetings and engineering reports/designs. <br /> Engineering: All engineering work (as defined in the Engineers Practice Act (012-25-102(10) C.R.S.)) <br /> performed under this grant shall be performed by or under the responsible charge of professional <br /> engineer licensed by the State of Colorado to practice Engineering. <br />