My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-2258 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-2258 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:34:01 AM
Creation date
9/23/2016 3:10:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-2258
Contractor Name
Grand Valley Water Users Association
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Grand Valley Water Users Association Agenda Item 17a <br /> September 21-22, 2016 Board Meeting(Updated September 22, 2016) <br /> Page 4 of 8 <br /> would be installed consisting of PVC and geotextile fabric on each side with a layer of shotcrete on top. <br /> This type of lining has been utilized in other Reclamation projects and has an anticipated lifespan of at <br /> least 50 years. This alternative will also have the benefit of providing additional accessible area at the <br /> top of the embankment between the canal and Colorado River for operation and maintenance <br /> activities. Currently this area is challenging for maneuvering, even with small vehicles. This design <br /> could provide up to seven feet of additional maintenance area at a cost of $800,000. <br /> TABLE 2: PROJECT COST <br /> Task Cost <br /> Construction $508,000 <br /> Permitting $23,000 <br /> Engineering a Professional Services $104,000 <br /> Construction Management $51,000 <br /> Contingency $114,000 <br /> TOTAL $800,000 <br /> TABLE 3: PROJECT FUNDING SUMMARY <br /> Entity Cash In-Kind Total <br /> Association $42,000 $12,000 $54,000 <br /> CWCB Loan $150,000 n/a $150,000 <br /> WaterSMART grant $296,000 n/a $296,000 <br /> Sub-total matching funds $488,000 $12,000 $500,000 <br /> Colorado Basin Account $15,000 n/a $15,000 <br /> WSRA Statewide Account $285,000 n/a $285,000 <br /> Total $788,000 $12,000 $800,000 <br /> The Association has paid $33,012 to date in engineering and permitting fees. As invoices are submitted <br /> for the remainder of the project cost, 20% of each invoice will be paid by the CWCB loan, 40%will be <br /> paid by the WSRA grant, 39% will come from the WaterSMART grant, and 1%will come from the <br /> Association's cash match. <br /> Permitting: The Association is working on the following permits: <br /> • NEPA Environmental Assessment - Cultural assessment work is complete and no <br /> mitigation work is required. <br /> • U.S. Army Corp of Engineers - The Association is communicating with Corps staff <br /> regarding the Nationwide Permits for the Project. <br /> • U.S. Fish and Wildlife Service - Flora and fauna consultations have been conducted with <br /> the Fish and Wildlife Service. <br /> Schedule: Permitting and final design are scheduled for completion by March 2017. Construction is <br /> anticipated in summer and fall of 2017. <br />
The URL can be used to link to this page
Your browser does not support the video tag.