My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150243 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 11:32:30 AM
Creation date
8/30/2016 11:32:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. At its January 2006 meeting, the CWCB approved a loan from the Construction Fund to <br /> the BORROWER in an amount up to $75,750,000 for PROJECT costs, not to exceed 90% of <br /> the cost of the PROJECT, including a loan origination fee of 1% of the amount of funds <br /> disbursed for PROJECT costs in accordance with CWCB Policy No. 16, at an interest rate <br /> of 3.75% per annum for a repayment term of 30 years. <br /> b. Pursuant to Bill 07-122, the Colorado General Assembly a d B to loan <br /> to the BORROWER an amount up to $75,750,000 for the PR <br /> 7. Borrower has several outstanding long-term debtsA ' s Utility nterprise, <br /> governed by its General Ordinance and applicable S in„; : .ed hereto <br /> as Appendices 3-5. <br /> 8. This Contract and the Promissory Note issued hereunder were authorize. I _ City <br /> pursuant to City Ordinance No. 2003-18, as amended by Ordinance 2003-70 <br /> (collectively, the "General Ordinance"), attached hereto as Appendix 3, and <br /> Ordinance No. 2007-30 (the "2007 CWCB Series Ordinance"), attached hereto as <br /> Appendix 5. <br /> 9. The CWCB accepts the provisions of Borrower's General Ordinance and applicable <br /> Series Ordinances which govern the Water Fund, as defined in the General <br /> Ordinance, and its existing debt. This loan shall receive a second-lien priority on the <br /> Water Fund's net revenues that will be on parity with existing and future second-lien <br /> revenue obligations. <br /> 10. The CWCB desires to make a loan (the "Loan") to the Borrower for the Project upon <br /> the terms and conditions stated herein. <br /> 11. This Contract is an intergovernmental contract and shall be so construed under the <br /> Special Provisions provided herein. <br /> DEFINITIONS <br /> Capitalized terms used in this Loan Contract shall have the respective meanings <br /> specified in the Factual Recitals hereto or in the General Ordinance. In addition, the <br /> following terms shall have the following respective meanings: <br /> 1. "Construction Documents" means any construction contracts, construction <br /> specifications, design specifications, and design plans. <br /> 2. "Debt Service Requirements" means the Debt Service Requirements of the Loan. <br /> 3. "Engineering Consultant" means Borrower's representative or employee responsible <br /> for the creation of the Construction Documents. <br /> 4. "Substantial Completion" means completion of the Project such that no further <br /> disbursements of funds are necessary and the total disbursement amount is finalized <br /> for repayment of the Loan. Loan repayment begins one year after the Substantial <br /> Completion date. <br /> Loan Contract C150243 <br /> Page 2 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.