My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150243 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 11:32:30 AM
Creation date
8/30/2016 11:32:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER CITY OF AURORA, ACTING BY AND Agency Name: Water Conservation Board <br /> THROUGH ITS UTILITY ENTERPRISE Agency Number PDA <br /> Contract No. C150243 Routing Number 08 PDA iP O <br /> Maximum Project Amount: $75,000,000 <br /> Loan Service Fee: one percent (1%) of <br /> Funds Disbursed <br /> Maximum Loan Amount: $75,750,000 <br /> Pitlib <br /> LOAN CONTRAC <br /> THIS LOAN CONTRACT, made this November 20, 2bW . ( : s y and <br /> between the State of Colorado for the use and benefit of the I - - .r • N al <br /> Resources, Colorado Water Conservation Board ("CWCB" or "STATE"), a • • f <br /> Aurora, acting by and through its Utility Enterprise, 15151 E. Alameda Parkway, Aur , <br /> Colorado 80012, a Colorado municipality ("BORROWER"). <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br /> made available and a sufficient unencumbered balance thereof remains available for <br /> encumbering and subsequent payment of this Contract under: Contract Encumbrance <br /> No. C150243, Fund Number 424, Appropriation Code L07, Organization YYYY, GBL <br /> A243, Program WTRC, Object Code 5510, Reporting Category 0243. <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies. <br /> 3. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be used <br /> for the construction of a portion of the Prairie Waters Conveyance System, <br /> hereinafter referred to as the PROJECT. The total cost of the Conveyance System is <br /> estimated at $250,000,000, and includes three pumping stations and approximately <br /> 33 miles of pipeline. The CWCB will finance up to $75,000,000 of the PROJECT (the <br /> Maximum Project Amount). <br /> 4. Description of Feasibility Study: The CWCB has reviewed a feasibility study report on <br /> the PROJECT compiled by CH2M Hill and containing the Loan Application, which is <br /> attached to the Loan Contract as Appendix 2 and incorporated herein by reference. <br /> The information provided in the application was true when given and remains true in all <br /> material respects unless otherwise noted. Based upon the representations made in the <br /> feasibility study and loan application, the CWCB determined the PROJECT to be <br /> technically and financially feasible. <br /> 5. CWCB's AUTHORITY: Construction Fund. This Loan is made pursuant to the provisions <br /> of §§ 37-60-119 and 37-60-120, C.R.S., which authorize the CWCB to loan money for <br /> water projects from the CWCB Construction Fund for the benefit of the people of the <br /> state, provided that the borrower assures repayment of that money. <br /> 6. BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION <br /> Loan Contract C150243 <br /> Page 1 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.