Laserfiche WebLink
s <br /> a. Because the BORROWER is a "public entity" within the meaning of the Colorado <br /> Governmental Immunity Act, CRS 24-10-101, et seq., as amended ("Act"), the <br /> BORROWER shall at all times maintain such liability insurance, by commercial policy <br /> or self-insurance as is necessary to meet its liabilities under th Act. <br /> b. Prior to the disbursement of any loan funds, the BORROWER i. WCB <br /> with a form satisfactory to the CWCB evidencing s ' insuranc II ovide <br /> the CWCB with documentation of renewals of said in r <br /> 16. Additional Contract Requirements. CWCB will allow inc u on a es ' the <br /> analysis of Borrower's Utility Enterprise revenues regarding pan y o ture <br /> debt. <br /> B. PROJECT PROVISIONS <br /> 1. Construction Fund Program Procedures. <br /> a. The BORROWER shall at all times maintain on the project an engineer, registered in <br /> the state of Colorado, to prepare plans and specifications for the PROJECT. <br /> b. Copies of the BORROWER'S and the Engineering Consultant's plans and <br /> specifications and any modifications thereto shall either be filed with the CWCB or <br /> shall be kept available for inspection by the CWCB at BORROWER'S office for <br /> verification of compliance with the terms of this contract. <br /> c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br /> § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> d. Borrower shall give notice to CWCB representative of all bid openings and the <br /> CWCB shall be allowed to attend such bid openings. <br /> e. The BORROWER shall Contract for the construction of the Project with responsible <br /> and capable construction firms. <br /> f. The BORROWER shall file with the CWCB or make available for the CWCB's <br /> inspection at BORROWER'S office a copy of the executed construction Contract <br /> documents consisting of the Contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. <br /> g. CWCB staff shall be apprised of all preconstruction conferences and weekly project <br /> meetings with reasonable notice and shall be permitted to attend any Project <br /> meeting or conference as requested (except BORROWER'S City Council executive <br /> sessions, executive negotiations or meetings with legal counsel). <br /> h. The Borrower shall contract with qualified firms for all aspects of the project, <br /> including, but not limited to, design, construction and construction management. <br /> The Borrower shall contract with a qualified construction management firm, whose <br /> Loan Contract C150243 <br /> Page 7 of 15 <br />