My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150153 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150153 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 2:05:23 PM
Creation date
7/28/2016 2:05:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150153
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br /> BORROWER: The Dolores Water State of Colorado <br /> Conservancy District, acting by and through Bill Owens, Governor <br /> the Dolores Water Conservancy District <br /> Water Activity Enterprise <br /> 3010,g53/5 <br /> By VBy <br /> Donald W. Schwindt, President For the Executive Director <br /> Department N <br /> Colorado Waterof Conservation Board <br /> (CO R R O R A T E Rod Kuharich, Director <br /> oE1` ) <br /> Attidst =7 Pre-Approved Form <br /> By OIL <br /> Bil F. Smart, Secretary .ni- Illi. n, WCB Contract Manager <br /> ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br /> CRS 24-30-202 requires that the State Controller approve all state contracts. This <br /> contract is not valid and there are no loan funds available until the State <br /> Controller, or such assistant as he may delegate, has signed it. <br /> Arthur L. Barnhart, State Controller <br /> By / <br /> Effective Date <br /> PAJD <br /> IN F ultra <br /> Page 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.