Laserfiche WebLink
The SCOPE OF WORK for the Rio Grande Dam and Reservoir Rehabilitation Project—Phase I, <br /> consists of the brief explanation of the project below, and the final design plans,technical <br /> specifications, and the unit price bid schedule for the Project, all attached. <br /> The Project involves the construction of an upstream clay slope liner, clay blanket, and grout <br /> curtain. In order to reduce seepage through the rock slide formation at the left dam abutment, a <br /> clay blanket slope liner will be installed on the upstream side of the dam at the left abutment. <br /> The clay blanket will be a zoned fill placed over the rock slide and extending across the west <br /> abutment of the dam approximately 100 feet. The zones include a filter layer, low permeability <br /> clay core, and cover zone. Additionally, a grout curtain will be constructed along the right <br /> abutment into bedrock. These improvements are expected to substantially reduce seepage and <br /> allow full storage capability of the reservoir to be restored. The Project is scheduled to be <br /> completed by November 30, 2013. <br /> COMPENSATION <br /> The contract work described above is on a Unit Price Work basis, with a not to exceed amount of <br /> $1,946,781.38. The bid provided by the Contractor provides a detailed breakdown of the costs <br /> associated with each bid item. It is understood by the parties that as the project evolves and <br /> additional data is obtained,that tasks and their associated schedules and costs may be modified <br /> (decreased or increased)to reflect current needs for successful completion of the work. It is <br /> understood that the SLVID will not exceed the estimated total without first obtaining a full <br /> amendment to the Contract. <br />