My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OEPDA 08-66 Management Documentation
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
OEPDA 08-66 Management Documentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 2:33:07 PM
Creation date
5/13/2016 2:33:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
OEPDA 08-66
Contractor Name
Centenial Water and Sanitation District
Contract Type
Grant
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s i <br /> Page Three <br /> Kirk Russell <br /> Colorado Water Conservation Board <br /> December 18, 2007 <br /> 2c) Based on input from CWCB staff and CWCB loan program information, provide <br /> the timing of the CWCB loan process (for those applying for loans both greater <br /> than and less than $10 million) and how /when money can be "drawn" from the <br /> loan and when it will need to be repaid. A draft of this document will be made <br /> available by January 14, 2008. The final version will accompany the Loan <br /> Feasibility Study Common Elements report. <br /> Task 3. Detailed Timeline with Notes for Internal Use <br /> Produce a more detailed timeline, to supplement the summary chart included in the Task <br /> 1 document. This timeline will also include portions that describe: <br /> 1) CWCB's loan and legislative requirements/approvals timeframe (for loans <br /> greater than $10 million, as well as for any legislative approvals that may be <br /> needed to facilitate the payment provisions of water users contracts managed <br /> by CWCB); <br /> 2) Typical city/district budgeting timelines; and <br /> 3) A more detailed timeline for the Corps' Feasibility Study/EIS/ Record of <br /> Decision/Mitigation Construction/Water Contracting timeframe. <br /> This timeline will be based on the best information currently available, recognizing that <br /> this document will require updates as the project develops. Optional start/end dates for <br /> certain components will be included, with further discussion in notes attached to the <br /> chart. A draft of this timeline will be provided to CWCB staff for review by January 14, <br /> 2008. A final version will be provided within 2 weeks of receiving review comments <br /> back from CWCB staff. <br /> II. TIME REQUIRED <br /> We can begin the proposed services as soon as we receive authorization to <br /> proceed. We estimate the services under Part I can be completed within one <br /> month after the Corps of Engineers releases the Draft Environmental Statement <br /> for public review and comment. The January 14, 2008 deadline is contingent on <br /> receiving timely input from CWCB and Corps staff, and timely acceptance of this <br /> proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.