My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C859617 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C859617 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2016 2:30:18 PM
Creation date
4/26/2016 2:30:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C859617
Contractor Name
Crook, Town of
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CDBG 89-617 (FIRST AMENDMENT) <br /> c. The contract expiration date shown in the second paragraph under "II. Time of Performance" <br /> be amended to read: "December 31, 1991". <br /> d. Section "III. Budget" be amended to read as follows: <br /> "Project Activities Project Funding <br /> State CDBG Contractor Other Total <br /> Flood Control Improvements (8D) $230,000 $ 8,000 $38,000 * $276,000 <br /> Engineering - 0 - 15,000 9,000 ** 24,000 <br /> Administration _ 0 _ 8.658 - 0 - 8.658 <br /> TCTALS $230,000 $31,658 $47,000 $308,658 <br /> * Includes$20,000 provided by Colorado Department of Highways for the hauling of materials <br /> anc $18,000 provided by Logan County for the hauling of materials and bridge construction. <br /> ** Engineering assistance provided by Muller Engineering and the Colorado Water Conservation <br /> Board." <br /> e. Section "IV. Payment Schedule" be amended to read as follows: <br /> "A. $218,500 Paid upon receipt and approval of written requests from the <br /> Contractor for funds to meet immediate cash needs. <br /> B. 11,500 Paid upon substantial completion of the Project,provided the <br /> Contractor has submitted and the Department has accepted <br /> all required quarterly report information and the flood <br /> drainage system maintenance manual as referenced under <br /> section 'I. Scope of Services' above. <br /> $230,000 TOTAL <br /> All requests for payment will be made in accordance with Paragraph 13 of the main <br /> body of the Original Contract." <br /> 3. This Contract Amendment shall become effective upon full and proper execution. <br /> 4. All provisions of the Original Contract remain in effect except for the specific provisions modified <br /> by this Contract Amendment. <br /> Page 2 of 4 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.