Laserfiche WebLink
F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bi• and bid <br /> bond at bidding. After the CWCB staff verifies that these documents co ply with <br /> the terms of this contract, the BORROWER may issue the notice to proce-d to the <br /> Construction Firms. <br /> G. The BORROWER shall conduct a pre-construction conference at which time the <br /> CWCB staff shall have the opportunity to review • •rove the co struction <br /> schedule. <br /> H. If the CWCB staff determines that the PROJE• • ires a - - i' ,•ec i•r during <br /> construction, the BORROWER shall employ a to • • has b-e ap•roved by <br /> the CWCB staff. <br /> I. The BORROWER shall construct the PROJECT in accord. i - f e ..pproved <br /> plans and specifications. <br /> J. Upon completion of the PROJECT construction, the BORROWER shall p 'yid- as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-8 -10-, C.R.S., <br /> the BORROWER shall provide the as-built drawings to the State Engine-r's office for <br /> approval and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall a ran e a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROSEw en such <br /> bills are due. <br /> M. PROJECT-related expenses incurred prior to the Effective Date of thf�s c•ntract in <br /> accordance with the legislative approval of this loan. <br /> SECTION 8—ELIGIBLE EXPENSES. The following items are eligible for loan dislurs-ments. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statm= ts, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, 1 nd ding the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local '.ws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in chang- orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including des gn and <br /> Appendix 1 to Loan Contract C150335 <br /> Page 3 of 4 <br />