My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150335 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150335 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 9:38:43 AM
Creation date
4/22/2016 9:38:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150335
Contractor Name
Cemter of Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 4-BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION(IF NEEDED) <br /> At its July 18, 2012 meeting, the CWCB approved a Small Project Loan from the <br /> Construction Fund to the BORROWER in an amount up to $404,000 for PROJECT costs, not <br /> to exceed 90% of the cost of the PROJECT, with a loan origination fee of 1% n accordance <br /> with CWCB Policy No. 16, at an interest rate of 2.50% per annum for a repaymeit term of <br /> 10 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> 1. A loan from the Colorado Water Conservation Board, in the original principal <br /> amount of $454,500, interest at 3.50% per annum, and erm of 10 years, of <br /> which $375,659.62 remains outstanding as of August 2' ` 4 , t al annual <br /> payment of$54,649.70 and a maturity date of October 20 <br /> 2. A loan from the Frida Bargas and Frida Wahl Tru- , o ','nal pn 'amount <br /> of$2,347,638.80, of which $1,196,287 remains ou '' ng ``.: I s,: . s 20, 2012, <br /> with an annual payment of$225,932 and a maturity date o 41 • <br /> Borrower's share of the annual payment is $32,285.70. The balance• nual <br /> payment is made by the Centennial Water and Sanitation District. <br /> The Promissory Note is non-recourse financing secured by Deed of Trust on the <br /> Randall and Sessions Ditch water rights. The property is not pledged as collateral <br /> for the CWCB Loan. <br /> SECTION 6—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> None <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state o Cobrado to <br /> prepare plans and specifications for the PROJECT. <br /> B. The BORROWER'S and the Engineering Consultant's plans and specifications must <br /> be submitted to the CWCB staff for verification of compliance with the ternhs of this <br /> Contract when available prior to bidding. Any modifications to tha plans and <br /> specifications must be approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoir, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. CWCB staff must be present at bid opening and must approve the award of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by <br /> the BORROWER and found acceptable by the CWCB staff. <br /> Appendix 1 to Loan Contract C150335 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.