My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-915 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-915 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 2:30:19 PM
Creation date
3/21/2016 9:43:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-915
Contractor Name
Duke Ditch Company
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Duke Ditch Company Agenda Item 13b <br /> March 16-17, 2016 Board Meeting(Updated March 18, 2016) <br /> Page 3 of 6 <br /> Project Description <br /> The Company considered the following Project alternatives: <br /> Alternative 1 - No-Action: This alternative was considered undesirable as it does not meet the <br /> Company's goal of reducing the risk of Ditch washouts requiring emergency repairs, nor does it reduce <br /> salinity or selenium loading to the Colorado River System. <br /> Alternative 2 - Pipe the Ditch with HDPE pipe: This alternative considered replacing all 2.7 miles of <br /> unlined ditch with High Density Polyethylene (HDPE) pipe but was rejected due to higher material cost <br /> and limited availability of pipe welding equipment required versus Alternative 3. <br /> Selected Alternative 3 - Pipe the Ditch with PVC pipe: This alternative will replace all 2.7 miles of <br /> unlined ditch with 18-inch to 24-inch diameter polyvinyl chloride (PVC) pipe. Existing structures, <br /> including four inlet structures and four outlet structures, will be replaced. Costs for the selected <br /> alternative are shown in the following table: <br /> TABLE 2: ESTIMATED PROJECT COST <br /> Task Cost In-Kind <br /> NRCS Design / Construction management $ 47,500 <br /> NRCS NEPA Compliance $ 23,700 <br /> NRCS Habitat Replacement $ 29,700 <br /> Construction $ 648,474 <br /> TABLE 3: PROJECT FUNDING SUMMARY <br /> Cash In-Kind Total <br /> Duke Ditch Company $0 $0 $0 <br /> CWCB Water Project Loan $90,000 $90,000 <br /> NRCS _ <br /> $100,900 $100,900 <br /> Salinity Control Program $464,000 $464,000 <br /> Sub-total matching funds $554,000 $100,900 $654,900 <br /> Gunnison Basin Account $47,237 $47,237 <br /> WSRA Statewide Account $47,237 $47,237 <br /> Total $648,474 $100,900 $749,374 <br /> NRCS funding is all in-kind. Salinity Control Program funds will be disbursed throughout the <br /> construction process as will the CWCB funds. Disbursements will be made on a pro rata basis per each <br /> pay request as 71% Salinity Control Program, 14% CWCB loan, and 15%WSRA grants. <br /> Permitting: All easements and right-of-ways have been secured. The Company expects to be exempt <br /> from 404 permitting by statutory exemption, 33 CFR Section 323.4(a)3. This exemption will be <br /> confirmed with the Army Corps of Engineers. <br /> Schedule: NRCS expects to complete the final design by August 2016. Construction will follow in the <br /> fall of 2016 with completion by spring of 2017. <br />
The URL can be used to link to this page
Your browser does not support the video tag.