My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2515 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2515 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 9:18:18 AM
Creation date
3/3/2016 2:49:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2515
Contractor Name
Lookout Mountain Water District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 10—DISBURSEMENT SCHEDULE <br /> For PROJECT costs: The BORROWER shall prepare a periodic progress report that sets <br /> forth a statement of the PROJECT costs expended for that period and shall forward said <br /> statement to the CWCB. After receipt of the periodic progress report from the BORROWER, <br /> and review and acceptance of the items therein as eligible expenses, as described above, <br /> the CWCB will pay to the BORROWER the amount set forth in the report or such portion as <br /> has been approved by the CWCB. Such payment shall be made within thirty (30) days <br /> from the CWCB's approval of each progress report. <br /> SECTION 11 —TIME FOR PERFORMANCE <br /> PROJECT BEGINS: Upon Effective Date of this CONTRACT (the date this CONTRACT is <br /> signed by the State Controller or his designee). <br /> PROJECT END DATE: Three (3) years from the Effective Date of this CONTRACT. <br /> [THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK] <br /> Appendix 1 <br /> Page 4 of 4 <br />