My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2515 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2515 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 9:18:18 AM
Creation date
3/3/2016 2:49:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2515
Contractor Name
Lookout Mountain Water District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. The BORROWER must provide a copy of the following construction contract documents: <br /> executed contractor's proposal, executed construction contract, executed performance <br /> bond, executed payment bond, executed notice of award, proposed notice to proceed, <br /> sample change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. After the CWCB staff verifies that these documents comply with the <br /> terms of this CONTRACT, the BORROWER may issue the notice to proceed to the <br /> Construction Firms. <br /> H. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff <br /> shall have the opportunity to review and approve the construction schedule. <br /> I. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by the <br /> CWCB staff. <br /> J. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for approval <br /> and filing. <br /> L. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> M. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> SECTION 9—ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders approved <br /> by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and construction <br /> management for CWCB approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this CONTRACT, <br /> reviewing construction contract documents, and for complying with all federal, state, and <br /> local regulatory requirements. <br /> J. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> Appendix 1 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.