My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150237 Application
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150237 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 2:32:35 PM
Creation date
2/16/2016 2:32:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-040
C150237
Contractor Name
Penrose Water District
Contract Type
Loan
County
Fremont
Bill Number
SB 07-122
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and attorney(s). <br />NAME ADDRESS and PHONE <br />Rocco F. Meconi Rocco F. Meconi, P.C. <br />718 Main Street, PO Box 1540, Canon City, CO 81215 <br />Phone: 719 - 275 -7551 <br />Mary L. Presecan, P.E. Leonard Rice Engineers, Inc. <br />2000 Clay Street, Suite 300, Denver, CO 80211 -5119 <br />Phone: 303 - 455 -9589 (Water resource related services) <br />Edward D. Meyer, P.E. GMS, Inc., Consulting Engineer <br />611 North Weber, Suite 300, Colorado Springs, CO 80903 <br />Phone: 719 - 475 -2935 (Civil design and general administration <br />services <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br />See attached Loan Feasibili y Study for Raw Water Acquisition and Utilization prepared <br />as an integral part of this application. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated construction <br />costs, if known. (See Table 5 in Study for detailed breakdown) <br />Estimated Engineering Costs:$ 1,616,163 <br />Estimated Construction Costs: $ 5,419,655 <br />Estimated Other Costs: $ 2, 694, 183 ( land acquisition, water rights purchase, etc.) <br />Estimated Total Costs: $ 9,730,000 <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 8,757,000 <br />Term (length) of loan: <br />Interest Rate: <br />30 years <br />3.25 % <br />Part C. — Project Sponsor Financial Information <br />(Usually 75 -90 % of Est. Total Costs) <br />(Usually 10, 20, or 30 years) <br />(Please call for our current rates) <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the financial capacity to repay any loans made by the CWCB. The following <br />
The URL can be used to link to this page
Your browser does not support the video tag.