My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150237 Application
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150237 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 2:32:35 PM
Creation date
2/16/2016 2:32:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-040
C150237
Contractor Name
Penrose Water District
Contract Type
Loan
County
Fremont
Bill Number
SB 07-122
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />Formed under Colorado Revised Statutes. Requested data included as Appendix A in <br />attached study. <br />4. Please provide a brief description of the owner's existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. <br />See attached Loan Feasibility Study. The District's water facilities consist of intake facilities <br />to intercept water from the Beaver Park Water, Inc.'s canal as well as a connection point <br />from Brush Hollow Reservoir. The water is diverted into the District's water treatment plant <br />that provides treatment levels in accordance with CDPHE regulations for surface water <br />sources. The water is conveyed to the District's distribution system and storage facilities. <br />The District's distribution system provides service to its 1,701 connected users. The <br />District's water supply is obtained by virtue of a lease with Beaver Park Water, Inc. This <br />project is geared to enable the District to pay for additional surface water rights on the <br />Arkansas River and develop those rights by of a well field and a transmission line to <br />convey the consumptive use of the rights to an enlarged Brush Hollow Reservoir. This will <br />allow the District to diversify its water supply sources and better assure itself of meeting the <br />District's raw -water needs during drought conditions. <br />For existing facilities indicate: <br />Number of shareholders NA or Number of customers served 1,701 taps (1,838 ERUs) <br />Current Assessment per share $ NA Number of shares NA <br />Number of acres irrigated NA Water Right: NA CFS. <br />Average water diverted per year: 489 acre -feet. <br />Part B. - Description of the Project <br />1. Name of the project or facility: Penrose Raw Water Acquisition and Development Project <br />2. Purpose of this loan application. Check one. <br />X New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />
The URL can be used to link to this page
Your browser does not support the video tag.