Laserfiche WebLink
SECTION 4-BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> At its September 14, 2005 meeting, the CWCB approved a loan from the CWCB <br /> Severance Tax Trust Fund Perpetual Base Account to the BORROWER in an amount up <br /> to $4,994,955 for PROJECT costs, not to exceed 90% of the cost of the PROJECT, with a <br /> loan origination fee of 1% in accordance with CWCB Polic No. 16, at an interest rate of <br /> 3.7% per annum for a repayment term of 20 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT AIDI <br /> The BORROWER has three outstanding obligatio ,, I. . • 1 Central Well County <br /> , <br /> Water District Water Revenue Refunding Bo ,t. ies,, 'i+ ', • of May 27, <br /> 2004, originally issued in the aggregate principal amou '., 4 0 106 nd !currently <br /> outstanding in the aggregate principal amount of $1,000,000,~ma - , Dcember <br /> 1, 2007; (2) a Loan Agreement dated September 15, 1992, with the Colorado Water <br /> Resources and Power Development Authority, as refunded in October 1998, {originally <br /> issued in the aggregate principal amount of $3,200,000 and currently outst nding in <br /> the aggregate principal amount of $845,449, maturing on October 1, 2012; and (3) a <br /> CWCB loan , dated May 1, 2005, in the principal amount of $3,937,500, With a 20 <br /> year term. The parity certificate signed by Watkins & Schommer, Inc. arjrd dated <br /> , establishing that the lien created by this loan is on parity with the <br /> BORROWER'S other debt obligations, is incorporated herein by reference. <br /> SECTION 6—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> No additional conditions. <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Col rado to <br /> prepare plans and specifications for the PROJECT. <br /> B. The BORROWER'S and the Engineering Consultant's plans and specificati ns must <br /> be submitted to the CWCB staff for verification of compliance with the to s of this <br /> Contract when available prior to bidding. Any modifications to the plans and <br /> specifications must be approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. CWCB staff must be present at bid opening and must approve the awa of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with respon ible and <br /> capable Construction Firms, which said Construction Firms shall be selected by <br /> the BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> Appendix 1 to Loan Contract C150209 <br /> Page 2 of 4 <br />