My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150209 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150209 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:11:18 AM
Creation date
1/7/2016 10:11:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150209
Contractor Name
Central Weld County Water District
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary - Central Weld County Water District <br /> Contract No. C150209 <br /> SECTION 1 -BORROWER INFORMATION <br /> Name: Central Weld County Water District, acting by and through <br /> its Water Activity Enterprise <br /> Address: 2235 2nd Avenue, Greeley, as 80631 <br /> Federal Identification No.: 84-0571286 <br /> Contact: John W. Zadel, General M • -r <br /> Phone Number: (970) 352-1284 Fax r • ber: (970) 3 - 65 <br /> E-mail address: wcwdistrict@gwest n , ; <br /> Type of Entity: Special District for k •` rs t • a 4` ve#rned by <br /> Article 1, Title 32, C.R.S. an oc:° • A - County. <br /> The Central Weld County Water Activity Enterprise is a <br /> water activity enterprise established by the District by <br /> Resolution dated November 18, 1993, pursuant to Article <br /> 45.1, Title 37, C.R.S., which resolution is inc rporated <br /> herein by reference. The Enterprise was form and is <br /> operated as an enterprise within the meaning f COLO. <br /> CONST. Art. X, Section 20. <br /> Section 2 — Project Description <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a lo n to be <br /> used for the construction of the Dry Creek Reservoir in a 50/50 partner hip with <br /> the Little Thompson Water District, located in Larimer County, h reinafter <br /> referred to as the PROJECT, at an estimated total cost of$21,600,000. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibil ty study <br /> report on the PROJECT compiled by Boyle Engineering Corporation, L kewood, <br /> Colorado, which is incorporated herein by reference, and, based pon the <br /> feasibility report, the CWCB determined the PROJECT to be techni Ily and <br /> financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Severance Tax Trust Fund Perpetual Base Account:This loan is made pu uant to <br /> the provisions of §§ 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R. ., which <br /> authorize the CWCB to loan money for water projects from the CWCB Sever nce Tax <br /> Trust Fund Perpetual Base Account for the benefit of the people of the state, ,provided <br /> that the borrower assures repayment of that money. <br /> Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans Df up to <br /> $5,000,000 from the CWCB's Construction Fund and the State Severance 1Cax Trust <br /> Fund Perpetual Base Account Fund without prior approval from the General <br /> Assembly. <br /> Appendix 1 to Loan Contract C150209 <br /> Page 1 of 4 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.