My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lower South Platte River Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
Lower South Platte River Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2015 10:59:50 AM
Creation date
11/20/2015 10:58:59 AM
Metadata
Fields
Template:
Loan Projects
Contractor Name
Colorado Water Conservation Board
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ILower South Platte River Study <br /> Colorado Water Conservation Board <br /> IDecember 2001 <br /> Table 4-6 Reconnaissance-Level Opinion of Probable Project Cost(LSP Site A <br /> I Dam and Reservoir(1,580 AF)) <br /> Table 4-7 Reconnaissance-Level Opinion of Probable Project Cost(Cottonwood <br /> Dam and Reservoir(4,000 AF)) <br /> I Table 4-8 Reconnaissance-Level Opinion of Probable Project Cost(Johnson Dam <br /> and Reservoir(10,600 AF)) <br /> Table 4-9 Reconnaissance-Level Opinion of Probable Project Cost(Harmony <br /> IDitch West Dam and Reservoir(10,000 AF)) <br /> Table 4-10 Reconnaissance-Level Opinion of Probable Project Cost(Hawk Springs <br /> I (Duck Cr.) Dam and Reservoir(3,500 AF)) <br /> Table 4-11 Reconnaissance-Level Opinion of Probable Project Cost(Sterling <br /> Lateral East Dam and Reservoir(4,900 AF)) <br /> I Table 4-12 Reconnaissance-Level Opinion of Probable Project Cost(Sterling <br /> Lateral South Dam and Reservoir(6,600 AF)) <br /> Table 4-13 Reconnaissance-Level Opinion of Probable Project Cost(Sterling <br /> ILateral West Dam and Reservoir(6,900 AF)) <br /> Table 4-14 Reconnaissance-Level Opinion of Probable Project Cost(North Sterling <br /> I Table 4-15 Regulation Pool Dam and Reservoir(7,600 AF)) <br /> Reconnaissance-Level Opinion of Probable Project Cost(Ramsey Draw <br /> Dam and Reservoir(2,900 AF)) <br /> I Table 4-16 Reconnaissance-Level Opinion of Probable Project Cost(Corral Creek <br /> A Dam and Reservoir(9,000 AF)) <br /> Table 4-17 Reconnaissance-Level Opinion of Probable Project Cost(Corral Creek <br /> IB Dam and Reservoir(2,500 AF)) <br /> Table 4-18 Reconnaissance-Level Opinion of Probable Project Cost(Skinner Draw <br /> I Table 4-19 Dam and Reservoir(5,400 AF)) <br /> Reconnaissance-Level Opinion of Probable Project Cost(Gerk Ring <br /> Dike and Reservoir(5,000 AF)) <br /> I Table 4-20 Reconnaissance-Level Opinion of Probable Project Cost(Troelstrup <br /> Ring Dike and Reservoir(5,000 AF)) <br /> Table 4-21 Reconnaissance-Level Opinion of Probable Project Cost(Johnson Lake <br /> IEnlargement Dam and Reservoir(5,400 AF)) <br /> Table 4-22 Reconnaissance-Level Opinion of Probable Project Cost Johnson Lake <br /> I Table 5-1 <br /> West Dam and Reservoir(3,500 AF)) <br /> Preliminary Wetland and"Waters of the U.S."Identification at the <br /> Proposed Lower South Platte Reservoir Sites <br /> I Table 6-1 Sample Financial Analysis <br /> Table 6-2 Sample Financial Analysis - Subsidy for$50/AF Water Supply <br /> Table 6-3 Sample Financial Analysis <br /> ITable 6-4 Sample Financial Analysis - Subsidy for$50 Water Supply(misspelled- <br /> see yellow sticky) <br /> I Table 6-5 <br /> Table 6-6 Sample Financial Analysis <br /> Sample Financial Analysis (Subsidy for$50/AF Water) <br /> IGEI Consultants, Inc. III 01002 Dec 2001 Lower South Platte River Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.