Laserfiche WebLink
ILower South Platte River Study <br /> Colorado Water Conservation Board <br /> IDecember 2001 <br /> 4.5.3 Water Bank/Interruptible Supply 4-27 <br /> I4.6 Preliminary Screening of Plan Elements 4-27 <br /> Section 5 — Formulation of Alternative Plans 5-1 <br /> I 5.1 Overview of Water Development Objectives 5-1 <br /> 5.2 Viable Storage Options 5-3 <br /> 5.3 Potential Combination Alternatives 5-4 <br /> I 5.4 Potential "Stand-Alone" Projects 5-8 <br /> 5.5 Comparison of Alternatives 5-9 <br /> 5.5.1 Cost Comparison 5-9 <br /> I 5.5.2 Wetlands and 404 Permitting 5-10 <br /> 5.6 Implementation Schedule Considerations 5-16 <br /> I Section 6—Assessment of Financial and Institutional Issues 6-1, <br /> 6.1 Overview 6-1 <br /> 6.2 Financial Assessment 6-2 <br /> I6.3 Institutional Considerations 6-3 <br /> Section 7 — Primary Conclusions and Recommendations 7-1 <br /> I 7.1 Conclusions 7-1 <br /> 7.2 Recommendations 7-5 <br /> • <br /> Section 8 - References 8-1 <br /> List of Tables <br /> Table ES-1 Cost of Potential Surface Storage Projects <br /> I Tables 2-1 Estimated Water Availability at North Sterling Canal Headgate <br /> Table 2-2 Estimated Water Availability at Harmony Ditch No. 1 Headgate <br /> Table 2-3 Estimated Water Availability at Peterson Ditch Headgate <br /> ITable 2-4 North Sterling Inlet and Outlet Canal System Monthly Feasible <br /> Diversion <br /> I Table 2-5 <br /> Table 2-6 Harmony Ditch No. 1 Monthly Feasible Diversion <br /> Peterson Ditch Monthly Feasible Diversion <br /> Table 3-1 Overview of Permitting Requirements <br /> I Table 4-1 Potential Surface Storage Sites <br /> Table 4-2 Cost of Potential Surface Storage Projects <br /> Table 4-3 (sh. 1) Scoring of Alternatives for Coarse Screening(Base Case) <br /> ITable 4-3 (sh. 2) Scoring of Alternatives for Coarse Screening(Sensitivity 1) <br /> Table 4-3 (sh. 3) Scoring of Alternatives for Coarse Screening(Sensitivity 2) <br /> Table 4-4 Reconnaissance-Level Opinion of Probable Project Cost(Ovid Dam and <br /> IReservoir(5,770 AF)) <br /> Table 4-5 Reconnaissance-Level Opinion of Probable Project Cost(Sedgwick <br /> IDam and Reservoir(2,230 AF)) <br /> GEI Consultants, Inc. ii 01002 Dec 2001 Lower South Platte River Study <br />