My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Recommended RICD Draft Rules - An Alternative Process
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Recommended RICD Draft Rules - An Alternative Process
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 12:40:03 PM
Creation date
11/11/2015 10:39:23 AM
Metadata
Fields
Template:
Water Supply Protection
Description
related to RICD Rulemaking 2001
State
CO
Basin
Statewide
Date
11/8/2001
Author
CWCB
Title
CWCB RICD Rulemaking 2001
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
k. Proposed Project. The RICD project for which a water right is being considered in the <br /> water court application. <br /> j. Staff. Means the Director and other personnel employed by the Board. <br /> RULE S. OPTIONAL PRE-APPLICATION MEETING <br /> Prior to submitting an Application to water court or to the Board, the Applicant shall have the <br /> opportunity to meet with Staff to discuss the Proposed Project, the Evaluation Factors and the <br /> procedure followed by the Board to review the Application. Staff will provide input regarding <br /> the Evaluation Factors as applied to the Proposed Project and how the Proposed Project can meet <br /> the intent of section 37-92-102 C.R.S. (2001). <br /> RULE 6. SUBMISSIONS REQUIRED FROM AN APPLICANT <br /> Within ten (10) days of filing an Application for a RICD with any water court, an Applicant shall <br /> submit a copy of the application to the Board Office. <br /> RULE 7. NOTICE <br /> Within three (3) days of the Application Receipt Date, the Staff shall post notice of receipt of the <br /> Application on the CWCB website. The notice shall include the name of the Applicant, the flow <br /> amounts claimed, the water division, the name of the water body, the county where the Proposed <br /> Project will be located, and the time frame for submission of public comment. The Staff shall <br /> also notify the county commissioners of the county in which the Proposed Project is (or will be) <br /> located and shall also include a notice of all pending RICD applications (if any) in all mailings <br /> that go out to the Board agenda mailing list. <br /> RULE 8. STAFF REVIEW <br /> Staff shall review the Application in consultation with the Applicant. The Staff shall prepare <br /> proposed written Findings of Fact and Recommendation based on the Evaluation Factors. Staff <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.