My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2047 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2047 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 1:01:14 PM
Creation date
10/28/2015 1:01:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2047
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
money. <br /> SECTION 4-BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION <br /> At its May 22, 2014, meeting the CWCB approved a Small Project Loan, from the <br /> Severance Tax Perpetual Base Fund to the BORROWER, in an amount up to $93,700 for <br /> PROJECT costs with a loan service fee of 1% in accordance with CWCB Policy No. 16 <br /> resulting in a loan service fee of$937 and a total loan amount of$94,637 at an interest <br /> rate of 2.50% per annum for a repayment term of 15 years. <br /> Pursuant to CWCB projects Bill HB14-1333, the Colorado General Assembly authorized <br /> CWCB to loan to the BORROWER a total amount up to $606,000 for the Chatfield <br /> Reallocation PROJECT. There will be a total of two (2) CWCB loan contracts. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> As of the date of the CWCB loan approval, the District had $659,144 in existing <br /> debt, consisting of two CWCB loans shown in the table below. The loans are current <br /> and in good standing. <br /> Lender Original Current Annual Maturity Collateral <br /> Balance Balance Payment Date <br /> CWCB $454,500 $291,204 $54,650 2019 Pledge of Tax <br /> (C150276) Revenues <br /> CWCB $404,000 $367,940 $46,161 2023 Pledge of Tax <br /> (C150335) Revenues <br /> Total $659,144 $100,811 <br /> SECTION 6—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> NONE. <br /> SECTION 7—ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Borrower's pro-rata share of the amount that is repaid to the United States <br /> Treasury for the proportion of the joint cost of Chatfield Project construction <br /> related to the 20,600 AF of reallocated water storage, as computed by the <br /> Assistant Secretary of the Army (Civil Works), and documented in the Record of <br /> Decision, Chatfield Reservoir Colorado Storage Reallocation Project, dated May <br /> 29, 2014. <br /> B. Borrower's cost of storage expense incurred prior to the Effective Date of this <br /> Contract in accordance with the approval of this loan. <br /> Appendix 1 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.