My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2004 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2004 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 10:29:28 AM
Creation date
9/30/2015 1:45:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2004
Contractor Name
Parkville Water District
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A D N R COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> 414 Denver, CO 80203 <br /> CO Colorado Water Mike King, DNR Executive Director <br /> ..• Conservation Board P (303)866-3441 <br /> Department of Natural Resources F (303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Derek Johnson, P.E., Project Manager <br /> 'J <br /> Kirk Russell, P.E., Finance Section Chief <br /> DATE: September 15-17, 2015 Board Meeting (Updated September 18, 2015) <br /> AGENDA ITEM: 23c. CWCB Loan and WSRA Grant <br /> Parkville Water District - Evans Reservoir Bypass Flume Replacement <br /> Introduction <br /> The Parkville Water District (District) is applying for a loan for the construction of the Evans Reservoir <br /> Bypass Flume Replacement (Project). The purpose of the Project is to protect the District's water <br /> supply reservoir by rehabilitating the Evans Reservoir Bypass Flume, which has reached the end of its <br /> useful life. Total Project cost is estimated at $533,430. <br /> In June of 2015, the District was recommended for a $250,000 Statewide Grant and a $50,000 Basin <br /> Grant by the Arkansas Basin Roundtable from the Water Supply Reserve Account (WSRA) which would <br /> cover 56% of Project costs. The District is requesting a loan from the CWCB to cover 34% of Project <br /> costs, and the remaining 10% to be covered by District funds. See attached Project Data Sheet for a <br /> location map and a Project summary. <br /> Staff Recommendation for WSRA Grant (Board approved Staff Recommendation on September 17, <br /> 2015) <br /> Staff recommends approval of up to $250,000 from the Statewide Account and $50,000 from the <br /> Arkansas Basin Account to the Parkville Water District to fund the Evans Reservoir Bypass Flume <br /> Replacement project. <br /> Staff Recommendation for CWCB Loan (Board approved Staff Recommendation on September 17, <br /> 2015) <br /> Staff recommends the Board approve a loan not to exceed $181,800 ($180,000 for Project costs and <br /> $1,800 for the 1% Loan Service Fee) to the Parkville Water District for the Evans Reservoir Bypass Flume <br /> Replacement project from the Severance Tax Perpetual Base Fund. The loan terms shall be 10 years at <br /> the reduced low-income municipal rate of 1.95% per annum. Security for the loan shall be in <br /> compliance with CWCB Financial Policy#5. <br /> (-of c04 <br /> Interstate Compact Compliance • Watershed Protection • Flood Planning Et Mitigation • Stream a Lake Protection w <br /> Water Project Loans Et Grants •Water Modeling • Conservation Et Drought Planning •Water Supply Planning I \* <br /> 418764 <br />
The URL can be used to link to this page
Your browser does not support the video tag.