My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contribution No. 470 & 471
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Contribution No. 470 & 471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:36:38 AM
Creation date
7/28/2015 11:31:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
R12AC60020
Description
related to the Platte River Endangered Species Partnership (aka Platte River Cooperative Agreement [CA]; aka Platte River Rocvery Implementation Program [PRRIP])
State
CO
NE
WY
Basin
North Platte
South Platte
Date
7/9/2015
Author
USBOR
Title
Requests for Disbursment of Contribution No. 470 & 471
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Analysis of T&P breeding pair and Whooping Crane site selection data in intensive phase. <br /> Significant staff time being dedicated to this activity. Publication prepared and ready for TAC <br /> review. <br /> • Width analysis underway linking physical features to habitat selection. <br /> • Oversight of website and database management system development and maintenance <br /> activities. <br /> • Efforts for moving forward with Effects Analysis in the context of a Structured Decision Making <br /> Process in lieu of Target Flow analysis on-going. Developing a timeline, personnel, and budget <br /> framework for the process. SDM training received by Kenny, Smith, and Farnsworth from the firm <br /> Compass in Vancouver, BC, Canada. <br /> • Channel width analysis progressing to compare field survey data to June and November areal <br /> data. <br /> • Design of wetlands at DeBore Tract nearing completion with development of Plans and <br /> Specifications. <br /> • Bid package for John's Tract control structures completed, but solicitation delayed until high water <br /> receeds. <br /> • Bid opening for Leihs wetland construction held and contractor selected, work will commence in <br /> fall. <br /> • Tern and plover monitoring in full swing, requiring heavy staff time in oversight of contractors as <br /> well as performing specific tasks for which EDO is responsible. <br /> • Historic Platte hydraulic modeling on-going. <br /> Outreach and Operations <br /> • Routine daily operations associated with management and support of EDO staff, acquisition of <br /> supplies and equipment, oversight of consultant and contractor contracts and payment, <br /> maintenance of property files, coordination of meeting logistics, and general administration of <br /> Program. <br /> • Presentation to Rowe volunteers made June 4th at Rowe Sanctuary near Gibbon, NE. <br /> • Participation via phone with WRAP meeting held in Lincoln, NE. <br /> • Meeting with Kearney Visitor Center on June 24th regarding crane viewing opportunities. <br /> • Coordination and participation in GC Meeting June 9 and 10 in Cheyenne, WY.. <br /> 4'4111 -1441 ()/[61 /I 5"- <br /> Jerry F.Kenny, Ph.D. Date <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.