My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Super Ditch Engineering_Invoices Multiple
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Super Ditch Engineering_Invoices Multiple
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2015 10:22:14 AM
Creation date
3/18/2015 10:22:04 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
Lowe Arkansas Valley Water Conservation District
Description
Super Ditch Delivery Engineering
Account Source
Statewide
Board Meeting Date
3/15/2011
Contract/PO #
150490
WSRA - Doc Type
Invoicing/Disbursements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br /> June 25,2013 <br /> Lower Arkansas Valley Water Conservancy District <br /> Jan Winner(via e-mail jwinner @centurytel.net) <br /> 801 Swink Avenue <br /> Rocky Ford,CO 81067 <br /> RE: Super Ditch Delivery Engineering-Invoice No. 17 <br /> Below is an invoice for professional services of ParsonsWater Consulting LLC related to the investigation of <br /> system demands and operations,river administration,and opportunities for future system operations in the <br /> Lower Arkansas Valley. The time period covered by this invoice is April 26,2013 through June 25,2013. <br /> Primary activities follow the invoice. <br /> INVOICE 17 <br /> Super Ditch Delivery Engineering <br /> Person Hours Rate Total <br /> R.Parsons 116.75 140 $ 16,345.00 <br /> OUTSTANDING INVOICES <br /> INVOICE 12—Originally billed to Adaptive Resources 12/27/2013 $ 2,905.00 <br /> INVOICE 16—Originally billed to Adaptive Resources 4/26/2013 and <br /> sent again to Adaptive Resources 5/22/2013 $ 14,210.00 <br /> TOTAL AMOUNT NOW DUE $ 33,460.00 <br /> Budget Status <br /> Monthly Billing Total Billing <br /> $ 16,435 $ 136,220 <br /> Primary Activities <br /> • Ongoing efforts related to analysis of StateMod model simulation output and necessary revisions to <br /> input files to improve baseflows throughout the river basin. <br /> • Ongoing communication and meeting with Jay Winner. <br /> • Communication with John Winchester regarding Pueblo Reservoir operations. <br /> • Communication with Adaptive Resources,Inc.personnel regarding irrigated acreage—well—surface <br /> water diversions relationships;lagging factors for subsurface return flows,and project scheduling. <br /> • Communication with Wilson Water Group,Erin Wilson,regarding approach to representing in <br /> StateMod model the off-channel reservoir systems and disaggregating different colors of water(e.g., <br /> for irrigation;for storage;for recharge and for augmentation). <br /> • Communication with Bureau of Reclamation(BuRec)lead on Arkansas Valley Conduit(AVC) <br /> study,Signe Snortland,and MWH Global,Josh Cowden,on availability of data from AVC study. <br /> ParsonsWater Consulting LLC 4729 W32nd Ave,Denver,CO 80212 303.667.5067 <br />
The URL can be used to link to this page
Your browser does not support the video tag.