Laserfiche WebLink
PRRIP — ED Office 6 March 14, 2012 <br />Platte River Recovery Implementation Program <br />Elm Creek and Cottonwood Ranch Section 404 Permitting Key Milestones and Events <br />Date <br />Action <br />Key Discussion /Outcome <br />Program holds a pre - application meeting with Corps <br />Key discussion points relative to Elm Creek and Cottonwood Ranch: <br />and discusses multiple future PRRIP Projects: <br />• If minimal impacts, Corps feels that NWP #27 would be <br />• Future in- channel tern /plover nesting island <br />appropriate for habitat creation projects. Corps did not think <br />locations: Cottonwood Ranch, Elm Creek, <br />there is much to be gained from a Regional Permit. <br />Ft. Kearny, Dipple, and Mormon Island <br />• Relative to the 2010 in- channel work, one submittal would be <br />12/22/2009 <br />• Sediment augmentation <br />acceptable with information provided per PCN requirements as <br />• Off- channel habitat <br />well as the elements requested within the June 23, 2006 letter. <br />• Flow consolidation <br />Corps will determine how to cover (separate or one permit). <br />• Reservoirs <br />This will be based on spatial and temporal elements of the <br />actions. <br />• All island - building work would fit under NWP #27. Corps has a <br />template through existing Cottonwood Ranch activities. <br />Program conducted a multi- agency meeting to discuss 2010 and future <br />PRRIP projects. A site visit was made to the Cook /Dyer properties and <br />to Cottonwood Ranch. <br />Key general discussion points: <br />• USFWS discussed that no wetland mitigation would be <br />recommended from their agency. <br />• Corps discussed the need for the Program to show functional <br />Program holds an agency coordination meeting to <br />gain from an ecosystem perspective. <br />03/31/2010 <br />discuss 2010 and future PRRIP projects in Kearney, <br />Key island - building discussion points (includes Elm Creek and <br />NE <br />Cottonwood Ranch): <br />• Discussed that a functional assessment would be useful to help <br />determine the loss in function and change in services. Should <br />use vegetation (floristic quality index) and adjacent land use. <br />• Fill of wetlands is a change in existing services. Need to relate <br />back to historic river and how the change in serves will benefit <br />the species. Describe in terms of ecological services <br />• Timing — Anticipate 30 days for a nationwide authorization and <br />120 days for an individual permit. <br />Page 1 <br />