Laserfiche WebLink
September 2013, and the efforts required to reconstruct the Tamarack and Heyborne <br /> recharge projects. Because most of the structures for these projects are located so close <br /> to the river, they cannot be insured for losses associated with flooding. SPWRAP agreed <br /> to fund the necessary repair costs in the event of flood damage. <br /> 5. NCWCD Backhoe: SPWRAP acted as an intermediary to facilitate the transfer of title to <br /> CPW of a backhoe owned by NCWCD but located at Tamarack and used by CPW staff <br /> in connection with Tamarack facilities. <br /> 2 M-AH-SPWRAP 10-14-14(Annual Meeting) <br />