Laserfiche WebLink
Name of Applicant: c11-11 eF i-e►•-L-- <br /> Date Received: -7/8/ tot 4 <br /> Grant Request: le IC.) 21=0 <br /> HB 04-1365: (Plans) Evaluation Checklist <br /> Applicant Demonstrates: Yes No Comments: <br /> That it is a covered entity <br /> If answered "no"to the above question,then is it an entity which will <br /> soon become a covered entity? <br /> (Only answer this question if the applicant is NOT currently a <br /> "covered" entity) Did they provide a reasonable engineering estimate <br /> of future annual retail demand for the next 3-5 yrs. , all based on <br /> population projections, building permits, expected new taps,and or <br /> some other creditable information that would show that the entity will <br /> become a "covered" entity <br /> Cover letter with the entities: name, contact information , and a <br /> signature of an individual with the authority to commit the resources <br /> of the entity <br /> A written statement from the entity's governing board, stating the <br /> entity's commitment to the "plan" and the implementation of long- ,✓ <br /> term water savings measures and programs (w/authorized signature) <br /> Disclosure of organizational structure/chart <br /> Current retail water demand (metered water use)for each of the past ✓ f <br /> five years (in acre ft. or million gallons) <br /> A list of people and/or organizations that will be involved in assisting ec -a <br /> with putting the plan together (list of who will be utilizing the grant <br /> money) _ <br /> Not required, but preferred, Information characterizing past water use re,, " T I, <br /> by sector, (e.g. residential, commercial, industrial) and the source (e.g. <br /> surface water,groundwater, etc). <br /> Characterization of the water system: <br /> Current (and if available past) per capita water use for the last five ✓ (f, 4 -1-1“,L , 4 <br /> years and the basis for this calculation <br /> Past, current, and predicted future population served by the entity, <br /> (and the source of this information) V - •3f 5-`° <br /> List estimated water savings goals to be achieved through the • Ct ,,,nh,• <br /> implementation of the "Plan", based on water system,the past as/E�OF Pry c <br /> over, yac <br /> conservation efforts and the future water needs (2.0 nr) <br /> Adequacy, Stability, and reliability of the entity's water system <br /> *to be measured and examined by staff through analysis <br /> Paragraph stating the purpose and the primary features of the entity's j <br /> desire to create a water conservation plan �/ <br /> A detailed narrative (description) of tasks to be performed with grant AT �F,,,A,;,-r A <br /> monies (related to the water conservation plan, and water efficiency <br />