Laserfiche WebLink
Table D1: Alternative Project Costs Cont'd <br /> I ".'�.tea "��'�� � + Aa a- y�,.r, `� � s� ?> �kcy ;k'1�' �"��'; x _��'�:� ��';* ��� ��� ��f �m '3x.r�"'fi° r'T <br /> ,1'/irerrtWWO)N M sh 3 b6 v nth 4 �Sp/l1►tia ;�r�d Sl*r +�, l e r t_ ;err._ : r, � <br /> Item Descri.tion Quanti Unit Unit Cost $ Total Cost $ <br /> Survey 1 ea. $6,500 $6,500 <br /> Demolish Existing Structure 1 ea. $10,000 $10,000 <br /> Erosion Control 1 ea. $3,500 $3,500 <br /> Earthwork 1 ea. $15,000 $15,000 <br /> Rip rap and bedding 100 ton $50 $5,000 <br /> Concrete 125 CY $725 $90,625 <br /> 4-foot x4-foot slide gates 2 ea. $28,600 $57,200 <br /> 5-foot by 6-foof overshot gate 1 ea. $61,300 $61,300 <br /> Access walkway 20 LF $200 $4,000 <br /> Controls shelter 1 ea. $4 000 $4 000 <br /> Subtotal $257,125 <br /> Mobilization(10%) $25,713 <br /> Engineering(12%) $34,000 <br /> Permitting(1%) $3,200 <br /> Contingencies(25%) $80,100 <br /> Total $400,200 <br /> vv_ <br /> 54 el) <br /> L�l <br /> � I <br />