Laserfiche WebLink
Table Dl: Alternative Project Costs <br /> i ? , S -,:0-rl 3. t- -0 i s ua #y S'7i -�- ,+ g-g- � *r <br /> �Ifeli,at►!e 1 - ft 1ctlor� .k. p t <br /> Item Description Quantity Unit I Unit Cost($) Total Cost($) <br /> Total $0 <br /> Alter'nativ'e 2 �Mo fyyExlstingr 'e nporary Structure n . ,, ,,.._:- >5.4. . . v .r4-: <br /> Item Description Quantity Unit Unit Cost($) Total Cost($) <br /> Demolish existing structure 1 ea. $10,000 $10,000 <br /> Stabilize banks and earthwork 1 ea. $5,000 $5,000 <br /> Improved trash-rack 1 ea. $5,000 $5,000 <br /> 48-inch pipeline 1 ea. $7,500 $7,500 <br /> 48-inch spigot gate 1 ea. $10,000 $10,000 <br /> Access bridge 1 ea. $1,200 $1,200 <br /> Subtotal $38,700 <br /> Mobilization(10%) $3,870 <br /> Engineering(10%) $5,100 <br /> Permitting(1%) $500 <br /> Contingencies(25%) $12,100 <br /> Total $61,000 <br /> litern tre R dal;date wth NewSprw y ad aeGates. <br /> __, ,,_ -, ,., _ . m , <br /> Item Description Quantity Unit Unit Cost($) Total Cost($) <br /> Survey 1 ea. $6,500 $6,500 <br /> Demolish existing structure 1 ea. $10,000 $10,000 <br /> Erosion Control 1 ea. $3,500 $3,500 <br /> Earthwork 1 ea. $15,000 $15,000 <br /> Rip Rap and Bedding 100 ton $50 $5,000 <br /> Concrete 125 CY $725 $90,625 <br /> 4-foot x4-foot slide gates 2 ea. $28,600 $57,200 <br /> Radial gate hoist and refurbish 1 ea. $20,000 $20,000 <br /> Access walkway 20 LF $200 _ $4,000 <br /> Subtotal $211,825 <br /> Mobilization(10%) $21,183 <br /> Engineering(12%) $28,000 <br /> Permitting(1%) $2,700 <br /> Contingencies(25%) $66,000 <br /> Total $330,000 <br />