Laserfiche WebLink
Mancos Water Conservancy District Page 2 <br /> December 2,2002 <br /> b) An approved contract must be in place before funds can be advanced. Jan Illian has <br /> placed this project on our "hot list" and will initiate the loan contracting process with a <br /> goal of having a signed contract in place by summer 2003. Once the contract is <br /> finalized the District may request loan funds to cover eligible project expenditures. <br /> c) You must adhere to the CWCB Design and Construction Administration Procedures. <br /> Tim Feehan will contact you regarding the CWCB requirements concerning project <br /> bidding, design, and construction. Tim will make construction inspections, which will be <br /> the basis of the monthly pay estimates for disbursement of your loan funds. <br /> On behalf of the Board, I would like to thank you for applying fora loan from the Colorado <br /> Water Conservation Board. <br /> Sincerely, <br /> Mike Serlet, PE, Chief <br /> Water Supply Planning and Finance Section <br /> Colorado Water Conservation Board <br /> Attachments: Updated Memo:MWCD 1102 memo <br /> cc(w/Attachment 1.): Mr.Don Schwindt,Board Member,Colorado Water Conservation Board <br /> CWCB Section B Staff <br /> Linda Bassi,AGO <br /> Chrono File <br /> C:Projects\Proj-New\MWCD 1102 Ltr <br />