Laserfiche WebLink
3 . The District shall , prior to commencing construction of <br /> the project, obtain such public access to the reservoir <br /> as the Board deems appropriate. <br /> 4 . Prior to commencing construction on the project, the <br /> District shall obtain from the owner(s) of any lands <br /> adjacent to the reservoir pool (at maximum water surface <br /> elevation) the right to receive any appreciation in the <br /> value of such lands which is attributable to the <br /> construction and existence of the reservoir if and when <br /> those lands or any portion thereof. are sold by the <br /> owner(s) . In turn, the District shall contract with the <br /> Board to convey to the Board any monies which it might <br /> receive as a result of this requirement, said monies to <br /> be in addition to the repayments required by item 1 <br /> above. <br /> gl <br /> -5- <br />