My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 02/16/1984
CWCB
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 02/16/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2014 11:36:37 AM
Creation date
11/25/2014 11:36:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/16/1984
Description
Minutes, Agenda, Memorandums February 16, 1984
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 ) The Plan of Study was apparently developed without <br /> input from the states. Most of the parameters being <br /> evaluated are critical to determination of 602 (a) <br /> storage. <br /> 2) The study results will not be available for review and <br /> comment until a draft is completed in November 1984. <br /> There will be only 3 months for review, comment and <br /> finalization of the report. This is completely <br /> inadequate for the state' s review and comment. <br /> The following recommendation should be made to the Bureau: <br /> The 7-Basin states need to be involved in the study <br /> while it is being prepared . This can be accomplished <br /> by periodic meetings with the Bureau to review the <br /> input data, the Alternates to be studied and the <br /> preliminary results of the study prior to the November <br /> 1 , 1984 release. This will enable the technical staffs <br /> to understand the technical aspects of the study and <br /> make appropriate recommendations to their state <br /> agencies. <br /> EIJ/gl <br /> i <br /> MEMORANDUM -2- February 15 , 1984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.