My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 02/16/1984
CWCB
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 02/16/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2014 11:36:37 AM
Creation date
11/25/2014 11:36:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/16/1984
Description
Minutes, Agenda, Memorandums February 16, 1984
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> House Journal-38th Day—February 10, 1984 Page 315 <br /> 1 applicable to the types of construction involved for such <br /> 2 projects, the following water resources and flood control <br /> 3 projects: <br /> 4 <br /> 5 Priority Project Name Cost <br /> 6 <br /> 7 1 Rangley $ 150,000 <br /> 8 2 Yamcolo 500,000 <br /> 9 3 Winter Park 150,000 <br /> 10 4 Beaver Park 630,000 <br /> 11 5 Lone Tree 50,000 <br /> 12 6 Kel ton weights 453,000 <br /> 13 7 Olive Street 125,000 <br /> 14 8 Brook Forest 250,000 <br /> 15 9 Palisade 1,000,000 <br /> 16 10 Manitou Springs 1,000,000 <br /> 17 11 Ute Water District 1,000,000 <br /> 18 12 Morrison 350,000 <br /> 19 13 Meadow Creek 1,000,000 <br /> 20 14 Terrace Reservoir Valve Project 629,689 <br /> 21 608,600 <br /> 22 15 Prospect Dam (The moneys for this <br /> 23 project are conditional to approval • <br /> 24 by the Colorado water conservation <br /> 25 board.) 633,000 <br /> 26 16 Rifle Water System (The moneys for <br /> 27 this project are conditional to <br /> 28 approval by the Colorado water <br /> 29 conservation board.) 300,000 <br /> 30 17 Sil t Water System (The moneys for <br /> 31 this project are conditional to <br /> 32 approval by the Colorado water <br /> 33 conservation board.) 300,000 <br /> 34 18 • Highland Lake Ditch (The moneys for <br /> 35 this prr ject are conditional to <br /> 36 approval by the Colorado water <br /> 37 conservation board and to the <br /> 38 agricultural stabilization and <br /> 39 conservation service providing 50 <br /> 40 percent funding for the project.) 1,200,000 <br /> 41 <br /> 42 Total $977}}7688 <br /> 43 $9,699,600 <br /> '44 SECTION 7. Section 5 (1) (a) of chapter 426, Session <br /> 45 Laws of Colorado 1981, is amended to read: <br /> 46 <br /> 47 Section 5. Project authorizations. (1) (a) Pursuant to <br /> 48 section 37-60-122 (1) (b), Colorado Revised Statutes 1973, the <br /> 49 Colorado water conservation board is hereby authorized to <br /> 50 construct, or cause to be constructed, the following water <br /> 51 resources and flood control projects: <br /> 52 <br /> 53 Paymen t <br /> 54 Period Total • <br /> 55 <br /> 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.