My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 07/13/1984
CWCB
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 07/13/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2014 1:22:01 PM
Creation date
11/21/2014 3:58:24 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1984
Description
Minutes, Agenda, Memorandums July 13, 1984
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agenda Item 13 - Stage 4 Approval, Closed Basin Project . <br /> In addressing this item, Mr. McDonald stated that the Act <br /> authorizing the Closed Basin Project provides that, in Section <br /> 101(b) , construction of the project may be undertaken in stages <br /> only if construction of each successive stage after stage 1 of <br /> the project is consented to by the Colorado Water Conservation <br /> Board and the Rio Grande Water Conservation District. The Bureau <br /> of Reclamation wishes to commence the construction of salvage <br /> wells in stage 4 in October 1984 (Federal FY 1985) , which is two <br /> months earlier than previously scheduled. To meet the proposed <br /> contract award dates for stage 4 salvage wells, the Bureau needs <br /> the Board' s and the District' s permission to proceed by the end <br /> of August, 1984 (Appendix F) . <br /> Mr. Robbins moved, seconded by Mr. Furneaux, that the Board <br /> adopt the following resolution and that Mr. McDonald be <br /> instructed to forward certified copies of the resolution to the <br /> District and to the appropriate officials of the Bureau of <br /> Reclamation. Motion adopted unanimously. <br /> RESOLUTION <br /> WHEREAS, Public Law 92-514, as amended by Public Law 96-375, <br /> authorizes the Secretary of the Interior, hereinafter referred to <br /> as the "Secretary, " to construct, operate, and maintain the • <br /> Closed Basin Division, San Luis Valley Project, Colorado, <br /> hereinafter referred to as the "project" ; and <br /> WHEREAS, Section 101(b) of said public law provides that: <br /> "Construction of the project may be undertaken in such units or <br /> stages as in the determination of the Secretary will best serve <br /> project requirements and meet water needs: Provided, that <br /> construction of each of the successive units or stages after <br /> stage 1 of said project shall be undertaken only with the consent <br /> of the Colorado Water Conservation Board and the Rio Grande Water <br /> Conservation District . . . " ; and <br /> WHEREAS, the Secretary, acting through the U. S. Bureau of <br /> Reclamation, desires to initiate the drilling of salvage wells <br /> and the acquisition of land needed for such wells in stage 4 of <br /> the project in federal fiscal year 1985 in order that such wells <br /> might be pump tested so that data can be obtained for the subse- <br /> quent design of pumps and distribution pipes ; and <br /> WHEREAS, all such wells will be capped after test pumping <br /> and not placed into production until the Colorado Water Conserva- <br /> tion Board and the Rio Grande Water Conservation District consent <br /> to the same. <br /> • <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.