Laserfiche WebLink
(g) prepare for possible initiation of construction of the <br /> Buckeye Reservoir in late summer or autumm of 1983 . <br /> After July 1 , 1984, with the expected return of the borrowed <br /> construction funds (as provided in H.B. 1320) , section 5 of H.B . <br /> 1102 provides that the Board proceed with the construction of <br /> authorized projects in the order of priority originally enacted. <br /> is <br /> Memorandum -2- May 2 , 1983 <br />