Northern Colorado Water Conservancy District Agenda Item 28b <br /> November 19-20,2014 Board Meeting (Updated November 21,2014) <br /> Page 3 of 5 <br /> The CWCB will delay the Loan's close-out date for at least one year after the Project's substantial <br /> completion date. This will allow the Enterprise to make the required payment for Interest accrued <br /> During Construction (IDC) after one year of power generation. <br /> Borrower - Northern Water Hydropower Water Activity Enterprise <br /> The Enterprise is a government-owned business within the meaning of Article X Section 20(2)(d) of the <br /> Colorado Constitution, organized pursuant to C.R.S. 37-45.1-101 et seq. and owned by the Northern <br /> Colorado Water Conservancy District. <br /> The Enterprise was established in 2011 for the purpose of acquiring, constructing, operating, and <br /> maintaining hydropower plants; and generating, distributing, selling or contracting to sell electric <br /> energy. The governing body of the Enterprise is the District's Board of Directors. <br /> The District is a quasi-municipal entity and a political subdivision of the state of Colorado organized <br /> under the Water Conservancy Act, C.R.S. 37-45-101 et seq. The District was created by decree of the <br /> Weld County District Court, dated September 20, 1937. <br /> In accordance with its Repayment Contract with Reclamation, the District collects a 1.00 mill levy <br /> property tax on real property located within its boundaries. These taxes are assessed by the individual <br /> counties and submitted to the District. In addition, the District collects water assessments from water <br /> allotment contract holders. <br /> The District has the authority to generate, distribute, sell, or contract to sell electric energy at <br /> wholesale rates through the operation of its facilities. The electric power may be used both within and <br /> outside the boundaries of the District (C.R.S. 37-45-118(2)). <br /> Project Feasibility <br /> Carl Brouwer, P.E., of the District prepared the Loan Feasibility Study, titled "Granby Hydro Project <br /> Loan Feasibility Study," dated April 1, 2014. The Study was prepared in accordance with CWCB <br /> guidelines and includes preliminary engineering, an engineer's estimate of probable cost that were <br /> used in determination of the total Project cost, and two years of audited financial statements. The <br /> District also submitted a supplemental report prepared by CH2MHill, titled "Feasibility Design Report <br /> Granby Hydropower Project," dated August 2011. <br /> Project Revenues and Expenses <br /> The Project is designed to generate 4,800,000 to 5,000,000 kilowatt-hours per year. Therefore, <br /> revenues are projected to be approximately $350,000 to $390,000 annually. Project expenses include <br /> a Mountain Parks Electric, Inc. capacity charge of $2 per kilowatt per month ($13,000 annually), <br /> Reclamation LOPP charge of 2 mills per kilowatt-hour (beginning at $11,774 annually and escalating at <br /> 1.5% per year) and operations and maintenance estimated at $50,000 annually (escalating at 1.5% per <br /> year). <br /> The Granby Hydropower LOPP term is 40 years from the time power generation begins. Payment is <br /> made annually to Reclamation based upon the capacity of the site and the kilowatt-hours produced. <br />