Laserfiche WebLink
. 07"O>9 o0 7e2- <br /> CHANGE ORDER LETTER- No. 06-01 <br /> In accordance with Article II.0 of the Contract Agreement between the Department of the <br /> Army, U.S. Army Corps of Engineers ("Government") and the State of Colorado Water <br /> Conservation Board ("State"), dated 2 September 1999, Contract Encumbrance No. <br /> C 153882, the State is authorizing the expenditure of$200,000 for the State's share of <br /> costs of the Chatfield, Cherry Creek and Bear Creek Feasibility Study pursuant to <br /> authorizations contained in C.R.S. 37-60-101 through 37-60-106. The undersigned agree <br /> that Article II.0 of the Agreement is amended by deleting "$1,265,000" and replacing it <br /> with "$1,465,000." <br /> This Amendment to the contract has been approved by the Controller of the State of <br /> Colorado or his/her designee, and shall be effective as of the date it is signed by the <br /> District Engineer for the U.S. Army Corps of Engineers, Omaha District. <br /> STATE OF COLORADO: DEPARTMENT OF THE ARMY: <br /> Bill Owens, Governor <br /> By 124C-\-- <br /> Director Colonel, Corps of Engineers <br /> Colorado Water Conservation Board District Engineer <br /> Rod Kuharich, Director Omaha District <br /> Date Date Z 5 6 7 <br /> STATE CONTROLLER: <br /> Leslie M. Shenefelt <br /> By 3---t■e>. \_./1-LK__CAL772/ <br /> Date �� <br />