My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GoreCanyonWater Supply Reserve Account Application Form
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
GoreCanyonWater Supply Reserve Account Application Form
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2014 4:12:55 PM
Creation date
11/6/2014 2:12:13 PM
Metadata
Fields
Template:
Water Supply Protection
Description
CWCB Water Supply Reserve Account Application Form Gore Canyon Whitewater Park at Pumphouse-Colorado River
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/30/2012
Author
Grand County
Title
CWCB Water Supply Reserve Account Application Form Gore Canyon Whitewater Park at Pumphouse-Colorado River
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 2—Permitting <br /> Description of Task: <br /> Grand County will secure all applicable permits including US Army Corps Engineers and CDPHE. <br /> Grand County will work with BLM who will prepare any Environmental Assessments required for the <br /> project. Grand County will work with BLM to secure a Right Of Way permit and agreement for the <br /> long term maintenance of the in-stream structures. <br /> Method/Procedure: <br /> Grand County staff, consultants and engineers will work with the appropriate agencies to secure the <br /> required permits. <br /> Deliverable: <br /> 404 Permit;CDPHE Permit;Environmental Assessment;ROW Permit. <br /> TASK 3—Coordination/Outreach/Education <br /> Description of Task <br /> Grand County will provide project coordination and outreach to other Roundtables, local government, <br /> agencies, outfitters and members of the public in order to provide a better understanding of how the <br /> construction of the project meets the Non-Consumptive Needs of the Colorado Basin. <br /> Method/Procedure <br /> Make public presentations to at least 4 other Roundtables, local government, agencies,outfitters, <br /> boating industry affiliated organizations and others. <br /> Deliverable <br /> List of public presentations,dates,locations with brief description of the response to the project. <br /> TASK 4-Signage <br /> Description of Task <br /> Develop and install education signage regarding the project at Pumphouse consistent with the BLM <br /> guidelines. <br /> Method/Procedure <br /> Contract for sign design,construction and installation. <br /> Deliverable <br /> Install 3 educational signs regarding the Gore Canyon Whitewater Park at Pumphouse. <br /> TASK 5—Construction of Whitewater Park structures <br /> Description of Task <br /> Hire an appropriate contractor to build the in stream features in accordance with the design <br /> specifications in the fmal design. <br /> Method/Procedure <br /> Following all appropriate Grand County contracting and bid processing guidelines,the County will <br /> contract with a construction firm to build the features to the specifications outlined in the bid <br /> specifications and bid documents. <br /> Deliverable— <br /> The project will be constructed. Progress reports including photos(before and during construction)will <br /> be provided to the Roundtable and to the CWCB. Photos of the project in use by boaters will be <br /> provided upon completion of the project. <br /> Project Tasks 6 through 8 are beyond the scope of the grant funds. <br /> • <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.