Laserfiche WebLink
Town of Silverthorne <br /> Case No.04CW2 17 <br /> Page 2 <br /> whether they have appeared or not. None of the water rights or structures involved herein are <br /> located within a designated ground water basin. <br /> 4. Opposition. Timely statements of opposition were filed by the Town of Dillon, <br /> the Colorado River Water Conservation District,the City and County of Denver acting by and <br /> through its Board of Water Commissioners,the Board of County Commissioners of the County <br /> of Summit, the Colorado Water Conservation Board("CWCB"),the Colorado Division of <br /> Wildlife,the Colorado Division of Water Resources, Trout Unlimited,the City of Colorado <br /> Springs, and Vidler Water Company,Inc. No other statement of opposition to the Application, <br /> as amended,has been filed,and the time for filing such statements has expired. <br /> 5. Stipulations. Silverthome entered into stipulations with[RESERVED]. The <br /> said stipulations were filed with and approved by this Court,and the terms thereof are <br /> incorporated herein. <br /> 6. CWCB Recommendation. On January 21,2005 pursuant to C.R.S. §§37-92- <br /> 102(5) and 37-92-305(16) Silverthome submitted a copy of the Application,as amended to the <br /> CWCB. After a public hearing held in Silverthorne on July 20,2005,the CWCB submitted its <br /> recommendation to this Court on September 16,2005. <br /> 7. Name of Structures. Blue River Whitewater Course("Course") which will be <br /> • located in the Silverthorne Whitewater Park(the approximate location of which is depicted on <br /> the map attached hereto as Exhibit A-1)includes three separate control structures(the <br /> approximate locations of which are depicted on the map attached hereto as Exhibit A-2). The <br /> structures are rock dam and drop structures that will direct the flow to pass through an opening <br /> of controlled width that will create a pooling effect upstream and control,concentrate,and direct <br /> the flow between specific points at a sufficient velocity and depth to produce a reasonable <br /> recreational experience in and on the water. <br /> 7.1 Legal Description of the Structures. The Course will be approximately <br /> 600 feet long,generally located within the channel of the Blue River in the town limits of the <br /> Town of Silverthome between the Interstate-70 overpass and the Colorado Highway 9 bridge as <br /> depicted on the map attached hereto as Exhibit A-2,in South 'A of Section 12,Township 5 <br /> South,Range 78 West of the 6th PM, Summit County,Colorado. The actual location of the <br /> Course shall be based upon the final location of Silverthorne's control structures. The <br /> • <br /> approximate locations of the center points of the three structures within the Course are as <br /> follows: <br /> Structure 1 located in the S/2 of Section 12,TSS,R78 W, <br /> 6th P.M.at a point 1050 feet from the south <br /> section line and 2380 feet from the east section <br /> line of said Section 12 <br /> Structure 2 located in the S/2 of Section 12,T5S,R78 W, <br /> P.M.at a point 1250 feet from the south <br /> section line and 2520 feet from the east section <br /> line of said Section 12 <br /> 1 <br />