My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Director's Report Attachment 03/07/2000
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Director's Report Attachment 03/07/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2014 2:25:18 PM
Creation date
9/23/2014 2:25:17 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/7/2000
Description
Director's Report Attachment March 20-21, 2000 Board Meeting Water Supply Planning and Finance Section Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Loveland, City of—Green Ridge Glade Reservoir Rehabilitation <br /> Authorization: HB 98-1189 County: Larimer-W. of Loveland <br /> Water Source: Big Thompson River Project Yield: 6,000 acre feet <br /> Terms of Loan: $5,000,000 @ 4.75%for 10 yrs. Project Type: Dam enlargement <br /> This $19.2 million project is the enlargement of the Green Ridge Glade Reservoir northwest <br /> of Loveland. The project consists of raising the crest of the existing dam approximately 60 feet, <br /> construction of a new concrete labyrinth weir spillway, and new multi-level intake gate tower outlet <br /> structure. The City has contracted with Woodward-Clyde of Denver to prepare the final design and <br /> construction contract documents. Environmental studies are currently underway with construction <br /> scheduled to commence in late 2001 or early 2002. <br /> • <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.